Summary
Bitlayer mainnet V1, launched in April 2024, runs a fork of go-ethereum with a canonical validator set and system contracts for staking and validator management. Up to 21 validators take turns signing blocks at a target interval of 3 seconds. V1 nodes hold and execute the account state; its documented finality comes from these validators. The planned V2 would submit state claims to Bitcoin through a BitVM challenge process with a seven-day window. The V2 overview still describes that design as upcoming. Bitlayer's July 2026 testnet shutdown notice said mainnet services continued normally. 235910202335
Design
Layer
Sidechain
Ledger structure
Chained blocks
Participation
Other
Class note
Bitlayer calls itself a Bitcoin layer 2 and BitVM rollup. Its V2 overview describes the running V1 network, Bitlayer PoS, as an existing sidechain architecture to be replaced. V1 has chained EVM blocks and up to 21 validators; the reviewed V1 docs do not establish validator admission requirements or a named approving body. BTC with 18 decimals pays gas, and BTR is a separate governance token.
Settles to
BitcoinBTC enters from Bitcoin through Bitlayer's official bridge, whose reserves are published as Bitcoin addresses held with MPC custody platforms; BRC-20 and Runes tokens used the same bridge before a closure notice dated 28 May 2026 whose deadline year is inconsistent. Bitcoin does not validate Bitlayer blocks, store Bitlayer data or enforce withdrawals; Bitlayer's own finality comes from its validators. The planned V2 would settle state to Bitcoin, but it was not found live.
Settlement family
Bitcoin family
Scarce resource
Other
State model
Accounts
Finality
Probabilistic
Who makes blocks
Up to 21 validators rotate block production, according to the V1 finality guide. The V1 overview names a canonical validator set and staking/validator-management system contracts; the utility-contract page lists a mainnet staking address. The reviewed primary pages do not establish the current validator count, admission authority, bonded asset or a live holder-delegation procedure.
Fork choice
Heaviest chain among the validator set: Bitlayer's docs say that when branches compete at a height, nodes pick the one with the largest total difficulty, so the latest few blocks can be reorganized. Only validators in the set can extend the chain, and Bitcoin's own chain plays no part in choosing Bitlayer's.
Qualifications
Layer · Contested. Bitlayer's introduction calls the network a Bitcoin rollup; its V2 overview says V2 will supersede the existing sidechain architecture. The V1 guide describes validator-produced EVM blocks, so the running network is recorded as a sidechain. No V2 mainnet launch was established.
Scarce resource · Contested. Recorded as other. Bitlayer PoS names staking and validator-management system contracts, but the reviewed V1 material does not establish what validators currently bond or how bonds select the active set. BTR staking and delegation appear in the V2 whitepaper; the February 2026 report still described a staking launch in preparation.
Finality · Partial. Bitlayer's docs call a block safe for most uses after 5 confirmations, very likely safe after 15 and absolutely safe after 21, which assumes the validator set behaves. There is no stage at which Bitcoin finality applies; the seven-day hard finality on Bitcoin belongs to the unreleased V2.
Bitcoin data availability · Not applicable. The V1 reference client stores and executes Bitlayer's EVM chain. Bitcoin data commitments and verification appear in the forthcoming V2 design; no active V1 publication route to Bitcoin was established.
Rollup upgrade · Unknown. Bitlayer's docs and whitepaper describe a V2 rollup verified on Bitcoin through a BitVM contract with one active operator. The 2024 V1 launch article gave later V2/V3 targets, but no current confirmed V2 activation date or live deployment was established. The public testnet's closure was scheduled for 31 July 2026.
Bitvm bridge · Not applicable. The separate BitVM Bridge mainnet documentation describes a Bitcoin-to-Ethereum beta with YBTC on Ethereum. Its closure notice states deposits were disabled effective 28 May 2026 and sets 3 June as the withdrawal deadline. Completion of the later settlement was not independently verified. This did not establish a BitVM bridge onto V1. The notice excludes YBTC.b.
Emergency authority · Applies. Bitlayer's bridge governance page gives a 7-of-10 Security Council multisig emergency powers, including an emergency withdrawal path, and the discontinuation notice says the council would withdraw broker funds directly at shutdown.
Participation · Unknown. Recorded as other. V1 documentation names a canonical validator set of up to 21, but does not identify a body approving admission or a public, sufficient set of requirements for joining it.
Settlement family · Applies. Bitlayer V1 runs a modified EVM with BTC-denominated gas and 18-decimal native BTC balances. Its Cancun rules exclude PREVRANDAO, BLOBHASH, BLOBBASEFEE and blob transactions; the documented Solidity ceiling is 0.8.28. BTR is a separate token.
Operating status · Applies. The July 2026 notice scheduled public testnet shutdown for 31 July and said mainnet was unaffected. The BitVM Bridge and BRC-20/Runes bridge routes have separate closure notices. Current block production was not independently observed; these service closures do not establish a mainnet halt.
Tradeoffs
This view follows one way of thinking about design priorities, often called the blockchain trilemma. The design-priorities lesson sets out the counter-view. Read the design-priorities lesson.
Emphasizes
Scalability Contested
Gives up
Open validator participation and trust-minimized custody are not established for V1: only its canonical set produces blocks, admission and bond requirements remain unclear, and the BTC reserve depends on MPC custody platforms named by Bitlayer, including Coinbase and Sinohope.Bitlayer's current introduction and rollup material claims Bitcoin-derived security, while its V2 overview says that architecture is upcoming. The reading remains contested. Scalability describes execution on V1 outside Bitcoin; no measured transaction rate is asserted. The reviewed V1 evidence does not establish automatic stake forfeiture for conflicting blocks or Bitcoin verification of V1 state.
Full node at home
Unknown 1524The full-node guide publishes minimums of 8 CPU cores, 16 GB RAM and an SSD above 5,000 IOPS, but gives no disk-capacity or network-bandwidth minimum. These incomplete requirements do not determine a home-node category. Port 31031 must be reachable. A March 2026 notice planned latest-state-only eth_getBalance and eth_call responses on the public RPC after maintenance; completion was not established.
Throughput claims
No classified figure recorded
Scaling layers
No scaling layer recorded in this profile.
Capabilities
Capabilities of Bitlayer: how each one is provided, or its research status
Capability
How it is provided
Notes and sources
Account abstraction
Independent softwareLimited scope
Particle Network lists Bitlayer in its SimpleAccount-only coverage. Its ERC-4337 service deploys smart accounts, sends UserOperations and supports fee sponsorship. This is independent account software; the other account types in Particle's coverage table are not shown for Bitlayer. Limited: opt-in; only accounts created as contract accounts gain changeable rules, and an ordinary account's key cannot change this way. 3334
Atomic swaps
Unknown
Building blocks only: V1 contracts can express hash locks and time locks. Bitlayer's BitVM FAQ describes MPC swaps and future atomic swaps, not a live Bitlayer HTLC route. Garden's maintained chain list and STON.fi's Omniston operational matrix do not list Bitlayer. No qualifying mainnet route was established. 2123839
Authenticated data publication
Unknown
Building blocks only: V1 exposes EVM transaction data and contract storage. The reviewed docs do not provide a publishing and reader-verification workflow with discoverable updates. V2's proposed data commitments and proof system do not establish such a service on the running V1 chain. 2911
Light clients
Unknown
The V1 node guide documents full and archive nodes, not a maintained light verifier for Bitlayer state. The Bitcoin light-client contract in the V2 design verifies Bitcoin headers for that design; it does not verify the running Bitlayer chain for a light user. 1115
Native staking or delegation
Unknown
The V1 docs list a mainnet staking system contract at 0x000000000000000000000000000000000000f000. They do not establish an active holder bond/delegation procedure, bonded asset or protection against operator spending. BTR delegation in the V2 whitepaper and the February 2026 launch-preparation report do not establish that procedure on V1. 2112535
On-chain governance
Unknown
BTR materials describe holder voting, but no binding V1 proposal/vote/enactment procedure was established. The BBN framework says governance contracts will be deployed and assigns interim powers to a 7-of-10 Security Council. A council's administrative decisions do not establish holder or consensus-participant voting on-chain. 142636
Parallel execution
Not present
The named parallel engine belongs to the V2 whitepaper: speculative transaction execution with runtime conflict detection. Bitlayer's current V2 overview explicitly calls that upgrade upcoming and identifies V1 as the existing architecture. This planned engine does not meet the mainnet requirement. Overlapping proof generation is not concurrent execution of shared programmable state. 9111520
Payment or state channels
Unknown
Building blocks only: V1 EVM contracts can implement timed settlement. The reference repository's DLC/LN discussion concerns design aims; no maintained channel implementation settling disputes on Bitlayer V1 was established in the client, wallet or V2 documentation. 101820
Programmable spending
Built into the protocolFull scope
Contracts run on an EVM at the Cancun rule set, without the PREVRANDAO, BLOBHASH and BLOBBASEFEE opcodes or blob transactions, and with Solidity up to 0.8.28. 24
Protocol-verified messaging
Unknown
CCIP's Bitlayer directory lists a committee verifier. LayerZero's own DVN and executor support ended on 28 August 2026 per its notice; independently configured routes were not checked. These systems do not establish proof verification enforced by V1. V2's planned Bitcoin verification and the separate Bitcoin-to-Ethereum BitVM Bridge do not establish a live V1 verification route. 101721272952
Reversible transfers or recovery
Unknown
Building blocks only: Bitlayer lists multisig and account-abstraction wallets, and Particle lists SimpleAccount support. Neither establishes a live delayed-payment cancellation or lost-key recovery module on Bitlayer. Safe's readable network table did not expose a Bitlayer recovery deployment; its generic module catalogue is insufficient. 183340
Rollups
Unknown
No rollup settling to Bitlayer was established in the reviewed V1 and V2 material. Bitlayer's planned V2 would settle to Bitcoin and replace V1; it is not a rollup built on the existing Bitlayer chain. 910
Shielded transfers
Not present
V1 documents public EVM account execution and provides ordinary balance and transfer-history queries. The nearest cryptographic feature, V2's zero-knowledge execution proof, verifies state transitions; it does not conceal transfer amounts, senders or recipients. No V1 protocol shielding mechanism is documented. 21145
Signed partial offers
Unknown
Building blocks only: V1 contracts and signatures can implement conditional trades. Bitlayer's wBTC guide points to Macaron pool swaps, and the BitVM FAQ describes a bridge swap service. Neither establishes a maker-signed offer that any taker can fill atomically without prior escrow. STON.fi's operational matrix omits Bitlayer. 2121939
Reading these values
How this feature is provided
Built into the protocol, core-team software or independent software says where a feature lives and who can change it. These are implementation layers, not quality: core-team software is not closer to the protocol than independent software.
Structured assessment pending
The shared review has not assessed this feature for any chain yet. That does not mean it is absent, and a chain’s profile may already describe it.
Unknown
The review has not established this for this chain under the current definition; the note beside it says why. Unknown is not absent and not a low score. A feature reads “Not present” only when a source shows it is absent.
Reading across rows
The list of capabilities is incomplete. Do not read these rows as a chain leading or lagging overall.
DeFiLlama's shared 30 September 2026 reading reports US$2,078 in 30-day DEX volume and US$232,124 in exchange deposits on Bitlayer, which gives limited ecosystem coverage under the adopted threshold. The docs name Macaron for BTC/wBTC swaps; Macaron and bitCow are the recorded exchange candidates. 194647As of Oct 11, 2026.
Issuer-native stablecoins
ThinbitUSD (bitSmiley, crypto-backed)
bitSmiley's overcollateralized bitUSD is minted on Bitlayer against wBTC, per its Bitlayer guide; the shared 30 September 2026 dataset records about US$253 thousand of it, below the US$100 million line, plus satUSD and USDa (crypto-backed, issuance on Bitlayer not checked) and bridged USDC. Bitlayer's peg-token guide identifies its USDC and USDT source as Ethereum; Circle and Tether omit Bitlayer. 628314344484950As of Oct 11, 2026.
Algorithmic stablecoins
Unknown
bitSmiley's published design presents bitUSD as dollar-pegged and overcollateralized, and its Bitlayer guide documents wBTC-backed minting. The shared dataset records US$253,458 of bitUSD on Bitlayer and classifies it, satUSD and USDa as crypto-backed. No current algorithmic-peg implementation was established; absence across V1 applications is not proven. 434448As of Oct 11, 2026.
Bridges
ThinBitlayer official bridge (Bitcoin and EVM chains), Chainlink CCIP, LayerZero
Bitlayer documents MPC custody partners but not current signer or upgrade-key holders; official branding does not establish team control. Chainlink's mainnet directory lists Bitlayer's router and lanes, supporting thin. LayerZero's own DVN/executor support ended 28 August 2026; other configurations remain unverified. Separate notices set BRC-20/Runes, BitVM and Sui YBTC.b closure deadlines; completion is unconfirmed and the BitVM notice excludes YBTC.b. Risk: BTC reserves depend on the official bridge's MPC custody and withdrawal controls; CCIP and LayerZero add their own verifier and upgrade trust. LayerZero reports that its DVN compromise enabled the KelpDAO rsETH bridge exploit on 18 April 2026, with no other channels compromised. This is not evidence of a Bitlayer loss. The closed BitVM Bridge also documented a 7-of-10 emergency council. 578141721222729415254As of Oct 11, 2026.
Block explorers
UnknownBTRScan
Bitlayer lists BTRScan and OKX as mainnet explorers. BTRScan's web page exposed no readable activity, its documented balance and block queries failed in this review, and the listed OKX URL returned 404. No explorer was independently observed serving data in this pass. These access failures do not establish an outage or mainnet halt. 1645As of Oct 11, 2026.
Hardware wallets
Unknown
Neither vendor row establishes a supported Bitlayer device-and-app path. Ledger's readable asset page does not confirm the network; its old feature-flag files could not be re-read. Trezor lists Bitlayer among LINK token networks and lists wallet apps separately, without pairing an app to Bitlayer. A generic EVM connection guide does not resolve that pairing. 18324251As of Oct 11, 2026.
Hardware-wallet custody
Hardware-wallet custody for Bitlayer
Device maker
Status
What users can and cannot do
Ledger
UnknownSame as native: Unknown
Cannot: A supported Bitlayer account path in Ledger Wallet or a named intermediary was not established from the readable vendor sources.The previously cited feature-flag source files could not be re-read. A code declaration or network registry entry alone would not establish a network enabled for users. Ledger's readable asset catalogue and Bitlayer's wallet list do not document a Bitlayer-specific device-and-app path.1851As of Oct 11, 2026.
Trezor
UnknownSame as native: Unknown
Cannot: The reviewed pages do not establish which Trezor app supports Bitlayer accounts or its BTC gas balance.The earlier BTR page could not be opened. Trezor's readable LINK page lists Bitlayer and several wallet apps in separate lists; it does not pair a specific app with Bitlayer. Its supported-coins guide does not list Bitlayer among Suite's native networks. Neither proves a Bitlayer MetaMask or Rabby path.183242As of Oct 11, 2026.
Public data
iKnow Blockchain has no public-data lookups for Bitlayer yet. This is a limit of the service, not a statement about the network.
Public-data lookups for Bitlayer
Lookup
Status
What it covers and its limits
Address or account
Not available yet
Public chain reads are not implemented for this chain in this build.
Tokens and assets
Not available yet
Public chain reads are not implemented for this chain in this build.
NFTs
Not available yet
Public chain reads are not implemented for this chain in this build.
Transactions
Not available yet
Public chain reads are not implemented for this chain in this build.
A lookup covers one address or transaction from one provider. It is never a complete wallet, and an error or private value is reported as unknown, not zero. About public data · Connect your AI
Sourced developments
Publication dates and individual review dates are kept apart. An unknown date remains unknown.
Publication date · newest first
Published ProductProposed, not adopted
Bitlayer announces its public testnet shutdown
Bitlayer announced that it would shut down its public testnet at 23:00 UTC on 31 July 2026, discontinuing all testnet services, data and endpoints. Test data would not be kept and test assets would not be converted to mainnet. Mainnet services were stated to be unaffected.
Proposal:service closure announced
Implementation:not independently verified
Release:not a software release
Activation:scheduled for 31 July 2026 at 23:00 UTC; completion not independently established
Date basis: Date shown on the Bitlayer Blog post: 29 July 2026. The shutdown time is the post's stated plan; this review did not test the endpoints on that date.
Correction history was not recorded for this historical item.
Record review:Review overdueReviewed Oct 16, 2026; next review was due Nov 16, 2026.
Published ProductProposed, not adopted
Bitlayer announces withdrawal of BRC-20 and Runes bridge support
Bitlayer announced that its official bridge would stop supporting BRC-20 and Runes tokens, permanently disabling deposits and withdrawals for them, and advised holders to bridge back to Bitcoin before the cut-off. BTC, ETH and stablecoins were stated to be unaffected. The post is dated 28 May 2026 but gives 30 May 2025 as the cut-off date.
Proposal:service closure announced
Implementation:announced; completion not independently established
Release:not a software release
Activation:unresolved: May 2025 deadlines appear in a post dated 28 May 2026
Date basis: Date shown on the Bitlayer Blog post: 28 May 2026. The body of both the English and Chinese versions gives 29 and 30 May 2025 as deadlines, which conflicts with the post date; the year of the cut-off was not confirmed.
Correction history was not recorded for this historical item.
Record review:Review overdueReviewed Oct 16, 2026; next review was due Nov 16, 2026.
Published ProductVerified against sources
Bitlayer discontinues its BitVM Bridge
Bitlayer's 27 May 2026 notice says BTC-to-YBTC deposits were disabled effective 28 May and gives 3 June as the last bridge-out date. It scheduled all remaining bridge functions to end then, with broker settlement by the Security Council and matching YBTC burns on Ethereum. It offered later OTC handling of small residual balances and expressly excluded YBTC.b.
Implementation:deposits stated disabled by the primary notice; broker settlement not independently verified
Release:not a software release
Activation:notice gives 28 May 2026 for deposit closure and 3 June 2026 for final withdrawal closure
Date basis: Date shown on the Bitlayer Blog post: 27 May 2026; the operational dates are the post's stated timeline.
Correction history was not recorded for this historical item.
Record review:Review overdueReviewed Oct 16, 2026; next review was due Nov 16, 2026.
Published ProductProposed, not adopted
Bitlayer says its public RPC will stop serving historical state
Bitlayer announced maintenance on its mainnet and testnet public RPC nodes and said that afterwards the public service would answer balance and contract-call queries only for the latest state, not for past block heights. Applications that need history were told to run their own archive node or use third-party providers.
Proposal:maintenance change announced
Implementation:not independently verified
Release:not a software release
Activation:planned after maintenance; no exact completion date established
Date basis: Date shown on the Bitlayer Blog post and in its signature: 22 March 2026.
Correction history was not recorded for this historical item.
Record review:Review overdueReviewed Oct 16, 2026; next review was due Nov 16, 2026.
Automatic headlines
These saved automatic records have not received an editorial review.
No automatic headlines are available to display.
Source checks
Current source-check information is unavailable. Saved records retain their original publication and review dates.
Topics your AI can explain
Your AI can explain these topics for Bitlayer through the connection, with sources.
What Bitlayer is and what BTC and BTR do on it
Who produces Bitlayer blocks and what secures them
Accounts on Bitlayer: balances, addresses and contract wallets
Fees and units on Bitlayer
When a Bitlayer transaction is final
How BTC gets onto Bitlayer and who holds it
Bitlayer V1 and the planned V2 rollup
Education
The complete recorded explanations are available here with their sources and individual review evidence.
What Bitlayer is and what BTC and BTR do on it
Record review:
Bitlayer runs an EVM network aimed at Bitcoin holders. Its gas coin is BTC brought over through Bitlayer's bridge and represented with 18 decimal places. BTR is a separate governance and incentive token with a stated total supply of 1 billion. Bitlayer presents itself as a Bitcoin layer 2, but its own V2 documentation describes the running V1 as a sidechain architecture. The BitVM-based rollup remains a planned V2.
Bitlayer's V1 mainnet launched in April 2024; the developer launch announcement is dated 15 April. Its chain ID is 200901 and wallets show BTC as its currency symbol.
The node software, bitlayer-l2, is a fork of go-ethereum, so Ethereum wallets, contracts and developer tools mostly work, with a few documented gaps such as no blob transactions.
The BTC gas balance is handled by Bitlayer's protocol, with 18-decimal precision. Bitlayer describes a one-for-one reserve relationship with BTC held by custody platforms outside the chain; this statement does not independently verify the reserves.
Wrapped forms exist for apps that need a token contract, such as wBTC and YBTC.B, an 8-decimal wrapper over native BTC that Bitlayer has deployed to other chains, mainly through Chainlink CCIP.
BTR exists on Bitlayer, Ethereum and BNB Chain. Bitlayer's token page names governance and ecosystem incentives as its uses; its tokenomics post also lists staking, which its February 2026 report still described as being prepared.
Bitlayer's research team works on BitVM, a way to check off-chain computation on Bitcoin through pre-signed transactions and fraud challenges. That work underpins Bitlayer's V2 plans, not the chain that runs today.
Common misunderstandings
Calling Bitlayer a Bitcoin layer 2 does not mean Bitcoin validates its blocks or holds its users' funds under Bitcoin's rules.
BTR is not the gas coin; ordinary transactions pay fees in BTC.
BTC on Bitlayer is a balance issued against a custodial bridge, not coins on the Bitcoin blockchain in the user's name.
Limits
Bitlayer's introduction calls it a rollup built for Bitcoin, while its V2 page calls the existing architecture a sidechain. This pack follows the documented V1 mechanics and keeps V2 plans separate.
Some Bitlayer documentation is out of date; for example, its V1 overview still says BTR has not launched, although Bitlayer's May 2026 vesting update gives 27 August 2025 as the token generation date.
Correction history was not recorded for this historical item.
Who produces Bitlayer blocks and what secures them
Record review:
Bitlayer's V1 documentation describes up to 21 canonical validators rotating block production at a target interval of 3 seconds, with system contracts for staking and validator management. It calls the design proof of stake. Current membership, admission requirements and active bonds were not established. V1 transaction inclusion and finality rely on this validator set; Bitcoin settlement belongs to the proposed V2.
Bitlayer's finality page says up to 21 canonical validators propose blocks and maintain the chain, with system contracts that handle staking and validator management.
Bitlayer's July 2026 testnet notice said mainnet services continued normally. The reviewed sources do not establish how many validators are currently active or who operates them.
V1's open-source full-node client stores and executes Bitlayer blocks. The reviewed V1 design does not use Bitcoin to verify that account state. A full node's execution checks do not establish the reserves held by the bridge's custodians.
Fees are paid in BTC and the V1 overview says the base fee is not burned. A mainnet staking contract is listed, but the reviewed material does not establish an active holder bond/delegation procedure or automatic penalties for conflicting V1 blocks. BTR delegation and slashing appear in V2 design material; February 2026's report still described a staking launch in preparation.
Bitlayer's V2 design keeps a validator set for fast blocks and adds a rollup operator that posts state commitments to Bitcoin, which anyone could challenge. The V2 documentation says only a single operator is currently supported and describes V2 as upcoming.
Common misunderstandings
Bitlayer's BitVM research does not secure the running chain; today's blocks are secured only by the validator set.
A staking contract existing on the chain does not by itself show that validators have stake at risk.
Limits
The V1 sources do not establish validator admission rules, current operator identities or current bonds. Capacity of up to 21 validators is not a current validator count.
The full-node guide lists at least 8 CPU cores, 16 GB RAM and an SSD above 5,000 IOPS, but omits disk-capacity and bandwidth minimums; its home-node requirements remain incomplete.
Correction history was not recorded for this historical item.
Accounts on Bitlayer: balances, addresses and contract wallets
Record review:
Bitlayer keeps state in accounts: each address has a balance, a transaction counter and, for contracts, code and storage, and a transaction changes those entries in place. A user's Bitcoin address and Bitlayer address are separate, and moving value between them means going through a bridge, not switching address format.
A Bitlayer account is identified by a 20-byte EVM address, and wallets such as MetaMask and OKX Wallet connect to it directly.
On Bitlayer, a payment simply lowers one account balance and raises another.
Contracts on Bitlayer run on an EVM at the Cancun rule set, except for the PREVRANDAO, BLOBHASH and BLOBBASEFEE opcodes, and Solidity up to version 0.8.28 is supported.
Bitlayer's peg-token table lists ERC-20 versions of USDT, USDC and ETH with their own decimals. It also retains BRC-20 and Runes entries covered by an official bridge closure notice; its publication and deadline years conflict, and completion was not independently established.
Bitlayer's docs list Bitcoin wallets such as UniSat and Xverse for the Bitcoin side of bridging, plus multisig and account-abstraction contract wallets for users who want smart-contract accounts on Bitlayer.
Particle Network currently lists Bitlayer for SimpleAccount smart accounts. Its ERC-4337 stack supports account deployment, UserOperations and fee sponsorship; that establishes independent account software, not a protocol change to ordinary account authorization.
Common misunderstandings
Connecting a Bitcoin wallet to a Bitlayer app does not change Bitlayer's account model; the app still acts through a Bitlayer account.
Limits
Account behaviour follows Bitlayer's compatibility notes; behaviour beyond what they list was not tested.
A multisig or account-abstraction wallet listing alone does not prove lost-key recovery. A supported Ledger or Trezor app path for Bitlayer was not established from the vendor material checked.
Correction history was not recorded for this historical item.
Fees on Bitlayer are paid in BTC and calculated using gas. Its BTC balance has 18 decimal places: one BTC is 10^18 of the smallest unit. The documented fee scheme uses a base fee and a priority fee, requires a minimum tip of 0.025 gwei and does not burn the base fee. Applications must preserve the documented precision when wrapping or bridging assets.
A transaction's fee is the gas it uses multiplied by the gas price. Bitlayer's documented minimum tip is 0.025 gwei, and a legacy-style transaction needs a gas price just above that.
Bitlayer's fee scheme separates a base fee from a priority fee; its V1 overview says the base fee is not burned.
Bitlayer disables Ethereum's standard fee-history method because wallets such as MetaMask could otherwise suggest tips far above what the network needs; it offers a replacement method and asks developers to set the tip themselves.
Blocks target a 3-second interval with a gas limit of 40 million, set in the node configuration.
YBTC.B has 8 decimal places. One smallest YBTC.B unit, 10^-8 YBTC.B, corresponds to 10^10 smallest native-BTC units under the documented one-for-one conversion. Its contract restricts native-BTC deposits to whole multiples of 10^10 smallest units.
Common misunderstandings
A whole BTC gas balance on Bitlayer contains 10^18 smallest units. That precision must not be confused with the 8-decimal YBTC.B wrapper.
Paying gas in BTC on Bitlayer does not spend coins on the Bitcoin blockchain or pay Bitcoin miners.
Limits
Fee settings come from Bitlayer's documentation and node configuration and can change; wallet estimates should be checked against the network's current gas price.
Correction history was not recorded for this historical item.
Bitlayer uses a heaviest-chain rule among its canonical validators, and recent blocks can be reorganized. Its own guide recommends 5 confirmations for most cases and describes 15 as providing a high probability of safety; it calls 21 theoretically safe without presenting a formal argument there. This is validator-based confirmation guidance, not Bitcoin settlement of V1 state.
When branches compete at a height, V1 nodes select the branch with the largest total difficulty among valid validator-produced blocks.
The finality guide gives 21 confirmations as its theoretical figure but does not derive it. The fact that the maximum validator set also has 21 members does not itself prove that every validator has signed a particular history.
The reviewed V1 finality guide describes confirmation counts and reorganization risk; it does not document a separate finality checkpoint. No current reorganization measurements were verified.
The planned V2 whitepaper describes validator confirmation followed by Bitcoin settlement after a challenge window of about seven days. A mainnet activation of that model was not established.
Returning BTC to Bitcoin also requires the official bridge to authorize a withdrawal from its custodial reserves. The reviewed V1 documentation does not establish a unilateral withdrawal route.
Common misunderstandings
Waiting for many Bitlayer confirmations does not give Bitcoin-level finality; it only makes a reversal by the validator set less likely.
Limits
The confirmation guidance is Bitlayer's own statement and assumes most validators behave honestly; no independent measurement of reorganizations was found.
Correction history was not recorded for this historical item.
Bitlayer's official bridge supplies its native BTC balance using reserves that Bitlayer says are secured by MPC custody platforms including Coinbase and Sinohope. Reserve addresses alone do not establish key control or redemption rights. The separate BitVM Bridge documented a Bitcoin-to-Ethereum YBTC route, key-deletion and challenge assumptions, and a 7-of-10 emergency council; Bitlayer's notice set a withdrawal deadline in June 2026.
Bitlayer's proof-of-reserve page lists Bitcoin addresses for the official bridge, separate addresses that held BRC-20 and Runes assets, and Ethereum addresses for assets bridged from Ethereum. The addresses show balances, not who holds the keys.
For EVM assets, Bitlayer adopted Chainlink CCIP in September 2025 as its canonical Ethereum route for BTR, USDC, USDT, ETH and wstETH. LayerZero's July 2026 notice, updated through September, gives 28 August 2026 as the end of its own Bitlayer DVN and executor services. That notice does not establish that every independently configured LayerZero route stopped.
Bitlayer announced in May 2026 that its official bridge would stop supporting BRC-20 and Runes tokens; BTC, ETH and stablecoins were stated to be unaffected.
The BitVM Bridge locked BTC in pre-signed Bitcoin transactions arranged so that, if at least one committee member deleted its signing key, the coins could move only along agreed paths. Brokers paid out withdrawals first and reclaimed BTC later, and watchers could challenge false claims.
The BitVM closure notice states deposits were disabled effective 28 May 2026 and gives 3 June as the withdrawal deadline. It says the Security Council would settle broker funds directly and burn the corresponding YBTC on Ethereum; completion of that settlement was not independently verified.
Bitlayer describes YBTC.B as backed one-for-one by its native BTC balance, which depends on off-chain BTC reserves. The BitVM closure notice explicitly excludes YBTC.b from that shutdown. A separate notice set 3 June 2026 as the Sui-to-Bitlayer YBTC.B bridge-back deadline.
Common misunderstandings
Bitlayer's BitVM work does not mean the BTC behind its gas coin sits in a BitVM contract; it is held by custodians.
A published reserve address shows coins on Bitcoin; it does not show who controls the keys or guarantee redemption.
Limits
The reviewed official-bridge material does not establish signer counts, thresholds or enforceable unilateral redemption; reserves and liabilities were not reconciled.
LayerZero's incident report attributes the 18 April 2026 KelpDAO rsETH exploit to its compromised verifier infrastructure and the affected app's single-verifier configuration. The report says other channels were not compromised; it does not establish a Bitlayer loss.
The BRC-20/Runes notice's publication date is May 2026, but its body gives May 2025 deadlines. The intended year remains unresolved.
Correction history was not recorded for this historical item.
Bitlayer's running network is V1, described in its V2 page as a sidechain architecture. The planned V2 would submit state claims to Bitcoin and allow challenges within about seven days. Its current overview still calls that architecture upcoming. Public-testnet and BitVM Bridge closure notices concern separate services and do not prove a mainnet halt.
Bitlayer's introduction page describes V1 as the live mainnet and V2 as under intensive development; its V2 page says V2 is designed to supersede the existing sidechain architecture.
In the V2 design, state claims are accepted optimistically unless challenged. A challenger can require the operator to defend a proof-verification step through Bitcoin transactions; the design relies on an honest, active watcher.
The V2 system design supports one active operator with backups and lets users force transactions through the data availability layer if they are censored.
Bitlayer's whitepaper names its own open issue: the bridge and settlement protocol would still rely on an honest majority within the validator set that forms the signing committee.
The 2024 V1 launch article proposed later milestones, but those historical targets are not activation evidence. Current V2 documentation still describes a successor architecture; no current mainnet release of it was established.
Common misunderstandings
BitVM research and documentation of a rollup design do not establish that V1 already settles its state through that design.
The planned seven-day challenge window would govern hard finality and withdrawals, not everyday transaction confirmation.
Limits
Roadmap statements are Bitlayer's own. Historical milestone targets exist, but no current confirmed V2 activation schedule, audit or public test of the V2 rollup contract was established for this pack.
Correction history was not recorded for this historical item.
Bitlayer's block explorer for mainnet blocks, transactions, addresses, tokens and validators, with a public query API.
Categories
explorer, infrastructure
Recorded historical status
Listed mainnet explorer; current data serving was not independently verified
Inclusion reason
The explorer named in Bitlayer's official documentation.
Limits
The operator's legal identity and a second independent explorer serving data were not established.
The failed reads do not establish an outage. Current block production and the completeness of the explorer's index were not independently verified.
Bitlayer lists BTRScan and documents balance and block queries. The web page exposed no readable activity, and the documented query URLs failed in this review.
Correction history was not recorded for this historical item.
Bitlayer's own bridge for bringing BTC from Bitcoin and assets such as USDT, USDC and ETH from EVM chains onto Bitlayer, and back.
Categories
bridge, infrastructure
Recorded historical status
Official app URL resolves; current route operation was not tested; BRC-20/Runes closure announced with conflicting deadline years
Inclusion reason
The canonical route for the BTC that Bitlayer uses as its gas coin.
Limits
BTC reserves depend on the bridge's MPC custody and withdrawal controls; no enforceable unilateral redemption route was established.
Signer counts and thresholds were not established, and Bitlayer's docs say third parties cannot call the official bridge directly.
The application exposed a navigation shell, not readable route activity. The BRC-20/Runes notice has an unresolved deadline-year mismatch.
Bitlayer's gas and bridge pages link to this site, its proof-of-reserve page lists the bridge's Bitcoin and Ethereum reserve addresses, and its bridges page names the MPC custody platforms.
Correction history was not recorded for this historical item.
Chainlink's cross-chain messaging and token-transfer protocol, which Bitlayer adopted in September 2025 as its canonical route to Ethereum for BTR, USDC, USDT, ETH and wstETH.
Categories
bridge, interoperability
Recorded historical status
Bitlayer listed as a mainnet network in Chainlink's CCIP directory
Inclusion reason
Bitlayer's stated canonical route for EVM assets and for moving YBTC.B to other chains.
Limits
The current Chainlink directory lists a committee verifier and routing contracts on Bitlayer. Transfers depend on those attestations, token-contract controls and upgrades; this is not proof verification performed by Bitlayer consensus.
BTC from Bitcoin enters through Bitlayer's custodial bridge; its cross-chain token representations have separate transfer paths.
Chainlink's CCIP directory has a Bitlayer mainnet entry, and Bitlayer's announcement and developer docs describe CCIP as its canonical cross-chain infrastructure.
Correction history was not recorded for this historical item.
An 8-decimal token that wraps Bitlayer's native BTC, minted on Bitlayer and bridged to other chains mainly through Chainlink CCIP.
Categories
wrapped-btc, token
Recorded historical status
Token contracts listed in current docs; Sui bridge-back deadline was 3 June 2026 under a separate closure notice
Inclusion reason
Bitlayer's main wrapped form of its native BTC for use in contracts and on other chains.
Limits
YBTC.B's stated backing is Bitlayer native BTC and its custodial reserves; balances and liabilities were not independently reconciled. The later BitVM closure notice expressly excludes YBTC.b.
The February report calls the Plasma route a BitVM bridge, while YBTC.B's token documentation describes separate wrapping and mainly CCIP routes. The precise historical Plasma route remains unverified.
The Sui route has its own closure notice. Vaults can impose lock-ups, strategy-dependent redemption delays and cross-chain risks.
Bitlayer's YBTC.B page gives its backing, decimals, conversion ratio and contract addresses, and Bitlayer's May 2026 notices describe the Sui route closure and state that YBTC.B was unaffected by the BitVM Bridge shutdown.
Correction history was not recorded for this historical item.
V1 participation, current validator count, bonded asset, active stake protection and automatic equivocation penalties remain unresolved; a listed staking contract is not a complete holder procedure.
V2 Bitcoin settlement, parallel execution and BTR delegation remain designs without an established mainnet activation. BBN binding holder governance was not established.
Current block production and serving explorer data were not independently observed. BTRScan's balance and block query reads failed, its website exposed no readable activity, and the listed OKX URL returned 404. This does not prove either service is offline.
The minimum full-node requirements omit disk capacity and network bandwidth. The March RPC maintenance notice does not establish when its planned historical-state restrictions took effect.
MPC signer identities, thresholds and unilateral-exit conditions were not established. Published reserve addresses were not reconciled against liabilities.
The BRC-20/Runes closure post is dated 28 May 2026 but gives May 2025 deadlines; the intended deadline year remains unresolved.
Documentation still lists the BitVM Bridge, testnet and BRC-20/Runes routes despite separate closure notices; scheduled shutdowns and settlement completion were not independently observed. The May 2026 BTR clarification gives TGE as 27 August 2025; V1's not-yet-launched wording is outdated.
YBTC.b is excluded from the BitVM shutdown, but the separate Sui bridge-back notice gives 3 June 2026 as its deadline. Reserves and current routes were not independently tested. LayerZero's own DVN/executor support has a 28 August 2026 end date; other configurations were not established.
Ledger support remains unknown after unavailable code pages and no clear supported app path. Trezor's token-network and app lists do not establish a Bitlayer pairing; device signing was not tested.
Garden and STON.fi do not list Bitlayer. Safe's readable table did not establish a recovery deployment. No live mainnet atomic swap, signed offer, recovery module, channel or Bitlayer light verifier was established.
V1 calldata/storage is not a documented data-publication workflow. No rollup settling to V1 was established.
bitUSD, satUSD and USDa are classified as crypto-backed in the shared dataset; an algorithmic-peg implementation remains unverified. The bitSmiley application exposed no readable live interface.
The fork-choice description was not re-checked. Its older Bitcoin Layers source could not be reopened and is not used for any newly checked claim.
Shared DeFiLlama measurements use the mandated 30 September snapshot. A current DEX endpoint was inaccessible and the current protocols response exceeded the browsing tool's size limit; no substitute live figures were used.
Sources
Oldest dated source check:Source check overdueSource checked Sep 27, 2026; next check was due Oct 27, 2026.
0 of 54 sources checked in the last 30 days; 54 are past the 30 days recheck.
Found something wrong or out of date? Reporting is free, and every chain goes through the same process. Published corrections appear in the public log.