Shutdown announced for Dec 31, 2026. It was still running at its last profile review; see the class note below.
The profile review date applies to the whole profile. 19 individual fields have no separately recorded review date.
Summary
ICX holders stake and delegate to registered P-Reps; ranked validators propose blocks and vote on them. The Foundation's March 2026 notice confirms seven core nodes, removal of the bond requirement and the end of emissions and staking rewards. Selection remains described through delegated ranking: the Foundation moved its own votes to keep its chosen nodes at ranks 1 to 7. This establishes concentration, not a separately documented admission approval rule. The Foundation reports a roughly 25-hour emergency halt in August 2026. 149182022
Design
Layer
Layer 1
Ledger structure
Chained blocks
Participation
Anyone who meets published requirements
Class note
ICON is a delegated proof-of-stake layer 1, running goloop with mainnet network ID 0x1. The Foundation reports maintenance operation with seven core nodes and no emissions or staking rewards from 26 March 2026. Its announced permanent halt is 31 December 2026; a future halt does not yet make this a historical chain. The September notice schedules ICX-to-SODA-only migration from 25 September. Current block production and migration transactions were not independently sampled.
Settlement family
Its own design
Scarce resource
Stake (proof of stake)
State model
Accounts
Finality
Other
Who makes blocks
Main P-Reps take turns proposing; validators vote on the proposed block. The operator guide documents registration and a fee of 2,000 ICX. The wind-down notice says the Foundation assigned its delegations to seven core nodes, excluding ranks eight and below from production and consensus. The February plan calls the seven core nodes Foundation-controlled, and the March notice reports consensus by that reduced seven-node set. Their current operating entities and vote weights were not independently checked.
Fork choice
Blocks enter the chain after validator voting, not an open contest between chains ranked by accumulated work. The docs call confirmed transactions permanent, but the current fault bound and fork-handling code were not verified. The Foundation reports halting at height 117,479,936 on 27 August 2026 and restarting on 28 August. That emergency stop is a liveness event, not evidence of a sender's reversal right.
Qualifications
Operating status · Partial. The Foundation reports maintenance operation with seven core nodes and no emissions or staking rewards from March 2026. It plans a permanent halt on 31 December 2026 and scheduled one-way ICX-to-SODA migration from 25 September. The announced May shutdown vote's outcome, current block production and the migration switch were not independently sampled. Live-chain classification remains until an actual permanent halt is established.
Steward control · Partial. The Foundation's post-mortem says the network is controlled by the ICON Foundation during the token migration period. It paused its migration contract and then halted the whole chain from 06:18:54 UTC on 27 August 2026 to about 07:51 UTC on 28 August, deployed a fix during the restart and added an allowlist so only its own relayer can submit withdrawal messages.
Slashing · Partial. The historical learning page describes slashable validator bonds. The rewards page says penalties are disabled on mainnet, and the March 2026 completion notice confirms the bond requirement was removed. Historical penalties do not establish automatic conflicting-signature slashing during maintenance operation.
Scarce resource · Partial. ICX delegation ranks validators, so stake remains recorded as the scarce resource. The Foundation describes concentrating its delegations on seven nodes. Emissions and staking rewards ended and the bond requirement was removed in March 2026; the current stake distribution and unstaking settings were not read.
Node software source · Unknown. The docs identify goloop. Its linked GitHub repository could not be read in this check; the public Go package index lists v1.4.4 dated 2 October 2024 and a v1.4.5-rc.0 release candidate dated 22 July 2026. Neither that index nor the docs establish which build the maintenance nodes run.
Throughput · Unknown. No classified transaction-rate claim was established in the opened sources. The documented block interval does not itself measure transaction-processing capacity.
Settlement family · Partial. Recorded as other. ICON's own terms: an independent delegated proof-of-stake chain run by goloop, the client the ICON Foundation supports, with its own JSON-RPC v3 interface, hx user and cx contract addresses, Java smart contracts and fees measured in steps and paid in ICX.
Finality · Partial. Recorded as other. ICON's own terms: validators propose and vote on blocks, with confirmed transactions described as permanent. The current safety threshold and fork-handling implementation were not verified. Seven core nodes perform consensus during maintenance; a manual halt affects liveness, and does not itself prove economic finality.
Tradeoffs
This view follows one way of thinking about design priorities, often called the blockchain trilemma. The design-priorities lesson sets out the counter-view. Read the design-priorities lesson.
Emphasizes
Scalability Contested
Gives up
Decentralisation of block production. Seven core nodes perform consensus during the wind-down, according to the March 2026 notice; the Foundation's February plan calls all seven Foundation-controlled. The Foundation also reports stopping and restarting the network in August. Remaining liveness depends on those operators and their announced end-of-year shutdown.Scalability reflects the developer overview's responsive-application goal, not a measured capacity result. That still-published overview also prioritizes decentralization, so this reading is contested; its incentive figures have been superseded by the 2026 shutdown notices. Security is not selected: penalties are documented as off and the bond requirement was removed, so automatic loss for conflicting signatures was not established.
Full node at home
Data-center class 79102021ICON's validator and API-endpoint guides list the same minimum for both roles: 4 CPU cores, 16 GB of RAM, a 2.5 TB SSD and a 1 Gbps connection, with 8 cores, 32 GB, 3 TB and 2 Gbps recommended, running the iconloop/icon2-node Docker image. A new node can restore the latest snapshot database instead of replaying history, which means trusting that snapshot. Only the seven core nodes take part in consensus, and the Foundation plans to halt the chain on 31 December 2026, after which there is nothing new to follow.
Throughput claims
No classified figure recorded
Scaling layers
No scaling layer recorded in this profile.
Capabilities
Capabilities of ICON: how each one is provided, or its research status
Capability
How it is provided
Notes and sources
Account abstraction
Unknown
Building blocks only: Java SCOREs can hold funds. Staky's Custodia proposal describes multisig wallets whose members can change, but the proposal does not establish a current mainnet deployment. A general contract engine alone does not verify persistent programmable account authorization. 638
Atomic swaps
Unknown
Building blocks only: No hash-time-locked or other trust-minimised swap mechanism settled on ICON was documented in the reviewed sources. Java smart contracts could host one, but none was reviewed. The ICX-to-SODA migration runs through the Foundation's migration contract and relayer, not a two-party swap. 622
Authenticated data publication
Unknown
Building blocks only: The storage guide discusses on-chain state and external storage, and an older learning page describes broof certificate metadata. A current mainnet flow combining authenticated publication, content checks and discoverable updates was not established; these leads remain building blocks. 1436
Light clients
Unknown
Building blocks only: BTP describes light-client verification of remote chains, while node setup offers a database snapshot. Neither establishes a maintained compact verifier of ICON's own chain. BTP's testnet table and the newer mainnet route list also disagree; a current ICON consensus anchor and proof-checking flow were not verified. 101537
Native staking or delegation
Built into the protocolFull scope
Protocol staking and delegation (the setStake and setDelegation calls) lock ICX, which the ICX guide describes as locked in the holder's wallet, and designate it to chosen P-Reps as voting weight rather than transferring it to them. The Foundation used delegation to concentrate consensus on seven nodes during the wind-down. Emissions and staking rewards ended on 26 March 2026; the value records consensus delegation, not ongoing yield. 14182033
On-chain governance
Built into the protocolFull scope
The built-in Governance SCORE accepts P-Rep proposals and votes, then applies approved changes including protocol revision and network SCORE code updates. This goes beyond fee or treasury parameters. Text proposals are advisory. The seven-node maintenance set concentrates voting; the announced shutdown vote's actual outcome was not verified. 20213435
Parallel execution
Unknown
Building blocks only: ICON's Java documentation says a node can execute multiple transactions in parallel. It does not document shared-state conflict handling or identify a current mainnet scheduler. JVM threading and Goloop's modular architecture alone do not verify that complete execution path. 67
Payment or state channels
Unknown
Building blocks only: Java SCOREs provide programmable contracts, but no maintained mainnet payment or state-channel implementation settling to ICON was established. Contract execution alone does not establish a channel service, and absence across applications was not verified. 6
Programmable spending
Built into the protocolFull scope
Java SCORE contracts execute conditional spending on ICON and charge instruction costs in steps. The Foundation's August 2026 migration-contract incident confirms mainnet contract use during maintenance. The planned 31 December halt limits the network's announced lifetime; it does not turn currently available contract execution into a historical capability. 3562122
Protocol-verified messaging
Unknown
xCall is a messaging interface. BTP documentation lists testnets, while Active Development lists mainnet BTP and IBC routes; a current on-ICON verifier checking a remote chain's consensus was not established. ICON Bridge uses a trusted Parameta relay, and the migration route uses an allowlisted relayer. Those trusted routes do not qualify. 1516172237
Reversible transfers or recovery
Unknown
Building blocks only: The transaction guide describes confirmed transfers as permanent. Java contracts and proposed multisig wallets could implement controls, but a current pre-arranged path restoring control of funds or reclaiming a transfer was not established. The Foundation's emergency chain halt is not a user recovery mechanism. 462238
Rollups
Unknown
No rollup anchored to ICON was found in the reviewed sources; absence was not verified. ICON's cross-chain tools (BTP, xCall and ICON Bridge) connect separate chains and are not rollups. 1617
Shielded transfers
Unknown
Building blocks only: ICON's zero-knowledge tutorial verifies a Sudoku solution before minting an NFT. Those proof primitives do not establish a live value-transfer system hiding sender, receiver and amount. No qualifying mainnet shielded transfer flow was verified. 39
Signed partial offers
Unknown
Building blocks only: Java contracts and SODAX migration operations were reviewed, but no live ICON flow was established where a maker publishes a partially signed offer that any eligible taker can complete without further maker interaction. A VM and a relayed migration do not establish that capability. 62226
Reading these values
How this feature is provided
Built into the protocol, core-team software or independent software says where a feature lives and who can change it. These are implementation layers, not quality: core-team software is not closer to the protocol than independent software.
Structured assessment pending
The shared review has not assessed this feature for any chain yet. That does not mean it is absent, and a chain’s profile may already describe it.
Unknown
The review has not established this for this chain under the current definition; the note beside it says why. Unknown is not absent and not a low score. A feature reads “Not present” only when a source shows it is absent.
Reading across rows
The list of capabilities is incomplete. Do not read these rows as a chain leading or lagging overall.
The shared 30 September 2026 dataset records $46,543 in 30-day DEX volume and $112,687 in exchange deposits on ICON. The Foundation announced the end of legacy Balanced incentives in March; Balanced's current site describes SODAX-backed cross-chain services. The frozen ICON measurement does not establish current pool depth or continuing rewards. 19274243As of Oct 11, 2026.
Issuer-native stablecoins
ThinbnUSD (Balanced, crypto-backed)
Balanced's bnUSD, issued on ICON against crypto collateral, is the one stablecoin the shared 30 September 2026 dataset lists on ICON (US$651,846), below the US$100 million line for a major ecosystem. SODAX documents conversion of legacy ICON bnUSD to a newer token; current legacy issuance and redemption were not tested. Circle and Tether do not list ICON. 1427284445As of Oct 11, 2026.
Algorithmic stablecoins
Unknown
Unknown. Balanced's bnUSD is backed by crypto collateral (Balanced says the design is not algorithmic), so it counts on the issuer-stablecoin row. DeFiLlama's 30 Sept 2026 data lists no other coin on ICON, and no source covering the whole chain shows absence of a non-collateral peg. 14262744As of Oct 11, 2026.
Bridges
First-partyICON Foundation ICX and legacy bnUSD migration to SODAX
The Foundation's post-mortem identifies its migration contract, owner controls and allowlisted relayer. Its September notice schedules ICX-to-SODA-only conversion from 25 September, with migration ending 31 December. This value covers that controlled migration route; current ICON Bridge, BTP and IBC route operation was not established. Risk: The Foundation reports an August 2026 replay exploit, contract pause and roughly 25-hour chain halt. It restricted withdrawal submission to its allowlisted relayer and reports recovery of bnUSD, with ICX recovery involving exchanges. Users rely on relayer and owner controls; current owner signing threshold and migration execution were not independently verified. Unmigrated ICX faces the announced year-end cutoff. 21222326As of Oct 11, 2026.
Block explorers
UnknownICON Tracker (documented route)
ICON's network guide links ICON Tracker and Sudoblock publishes its indexer stack. The site returned an application shell and current API data could not be read in this check. No operator was independently seen serving current chain records, so a working explorer value was not established. The promised post-halt archive has no verified address. 8212540As of Oct 11, 2026.
Hardware wallets
ThinLedger through Hana Wallet
Ledger's current ICON page documents Hana Wallet as the device interface. This is a third-party path with unverified feature parity. Trezor's ICON page says Trezor does not currently support ICON. 2930As of Oct 11, 2026.
Hardware-wallet custody
Hardware-wallet custody for ICON
Device maker
Status
What users can and cannot do
Ledger
Through an intermediaryHana WalletSame as native: Unknown
Can: Use the Ledger-to-Hana ICX path documented by Ledger. Cannot: Assume this documents every contract, staking or migration operation on the device.The Foundation announced Ledger Live send/receive support in 2024, but the current vendor page routes ICX management through Hana. Current Ledger Wallet availability, transaction display and feature parity were not established. The announced ICON shutdown applies to network operation, not to whether a device can retain keys.21242931As of Oct 11, 2026.
Trezor
None foundSame as native: No
Cannot: Manage ICX in Trezor Suite; Trezor's ICON page says Trezor does not currently support ICON.Trezor's ICON page, opened on 12 October 2026, says Trezor does not currently support ICON and asks users who used it with Trezor in the past to contact its support team. No route through a third-party wallet was reviewed.30As of Oct 12, 2026.
Public data
iKnow Blockchain has no public-data lookups for ICON yet. This is a limit of the service, not a statement about the network.
Public-data lookups for ICON
Lookup
Status
What it covers and its limits
Address or account
Not available yet
Public chain reads are not implemented for this chain in this build.
Tokens and assets
Not available yet
Public chain reads are not implemented for this chain in this build.
NFTs
Not available yet
Public chain reads are not implemented for this chain in this build.
Transactions
Not available yet
Public chain reads are not implemented for this chain in this build.
A lookup covers one address or transaction from one provider. It is never a complete wallet, and an error or private value is reported as unknown, not zero. About public data · Connect your AI
Sourced developments
Publication dates and individual review dates are kept apart. An unknown date remains unknown.
Publication date · newest first
Published FoundationProposed, not adopted
Foundation scheduled closure of reverse SODA-to-ICX migration for 25 September
The 24 September notice moved the announced reverse-conversion closure from 30 to 25 September 2026, citing the migration's progress, exchange support and August incident. It retained 31 December as the final deadline for ICX-to-SODA conversion. The current migration page displays the ICON-to-Sonic direction, but this check did not test whether the reverse function is disabled.
Proposal:Reverse-conversion closure announced for 25 September 2026
Implementation:Current migration page displays ICX to SODA; reverse execution was not tested
Release:Notice published 24 September 2026
Activation:Scheduled for 25 September; independent activation evidence not established
Date basis: Publication date displayed on the primary Foundation post; the earlier RSS time could not be reproduced in this check.
Correction history was not recorded for this historical item.
Record review:Review overdueReviewed Oct 16, 2026; next review was due Nov 16, 2026.
Published FoundationVerified against sources
Migration-contract replay exploit led the Foundation to halt ICON for about 25 hours
The Foundation's 30 August post-mortem reports a 27 August replay flaw in migration withdrawals, release of Foundation-held ICX and bnUSD, and a roughly 25-hour chain halt. It describes a serial-number fix and restricted relayer admission, reports no user deposits affected, and says bnUSD was recovered while ICX recovery involved exchanges. These are the publisher's findings; this check did not independently reproduce them.
Implementation:serialization fix and relayer allowlist deployed during the restart
Release:post-mortem published
Activation:The Foundation reports restart at about 07:51 UTC on 28 August 2026; its publication does not establish today's withdrawal or recovery status.
Date basis: Publication date displayed on the primary Foundation post; the earlier RSS time could not be reproduced in this check.
Correction history was not recorded for this historical item.
Record review:Review overdueReviewed Oct 16, 2026; next review was due Nov 16, 2026.
Published FoundationProposed, not adopted
ICON Foundation set 31 December 2026 as the date to halt the ICON chain permanently
The Foundation announced that the ICON Network will shut down on 31 December 2026: the chain will be permanently halted, a read-only archive will be offered for historical lookups, and ICX can no longer be migrated after that date. It said a governance vote would ask validators to approve the shutdown in May 2026, and that migration would become one way from 30 September.
Proposal:validator governance vote announced for May 2026; result not verified
Implementation:Permanent halt remains scheduled for 31 December 2026; present block production was not independently sampled.
Release:shutdown date announced
Activation:planned for 31 December 2026
Date basis: Publication date displayed on the primary Foundation post; the earlier RSS time could not be reproduced in this check.
Correction history was not recorded for this historical item.
Record review:Review overdueReviewed Oct 16, 2026; next review was due Nov 16, 2026.
Published ProtocolVerified against sources
ICON entered economic shutdown: emissions and staking rewards ended
The Foundation said all staking rewards and ICX emissions had ended and that the network was in maintenance mode, with consensus handled by a reduced set of seven core nodes. It said the chain would stay live so holders could migrate ICX to SODA on Sonic, and that the bond removal lets validators unbond without penalty.
Proposal:set out in the 6 February 2026 phased plan
Implementation:emissions and rewards ended; validator set reduced to seven core nodes
Release:announced by the Foundation
Activation:The Foundation reports completion on 26 March 2026; current registry state was not independently read.
Date basis: Publication date displayed on the primary Foundation post; the earlier RSS time could not be reproduced in this check.
Correction history was not recorded for this historical item.
Record review:Review overdueReviewed Oct 16, 2026; next review was due Nov 16, 2026.
Published FoundationVerified against sources
ICON Foundation announced a phased halt to ICX emissions and a seven-node validator set
The Foundation set out five phases: a governance vote to remove the 1% validator bond (16 February), four added Foundation nodes (2 March), moving Foundation delegations so seven core nodes hold ranks 1 to 7 (16 March), excluding nodes ranked eighth and below from consensus (23 March), and an economic shutdown ending new ICX emissions (26 March). It said the chain would stay live for transactions and migration to SODA.
Proposal:bond-removal governance vote announced for 16 February 2026
Implementation:phased plan announced
Release:Announced
Activation:the Foundation's 26 March 2026 post says emissions ended and seven core nodes run consensus
Date basis: Publication date displayed on the primary Foundation post; the earlier RSS time could not be reproduced in this check.
Correction history was not recorded for this historical item.
Record review:Review overdueReviewed Oct 16, 2026; next review was due Nov 16, 2026.
Automatic headlines
These saved automatic records have not received an editorial review.
No automatic headlines are available to display.
Source checks
Current source-check information is unavailable. Saved records retain their original publication and review dates.
Topics your AI can explain
Your AI can explain these topics for ICON through the connection, with sources.
What ICON is, and where it stands in its 2026 wind-down
Delegated proof of stake: main P-Reps, and the seven core nodes of 2026
Accounts, Java smart contracts and ICON's state
STEP fees, loop and ICX units
Validator-confirmed blocks and the August 2026 halt
Running an ICON node: goloop, hardware and snapshots
Wallets, hardware custody and migrating ICX to SODA
BTP, xCall and ICON Bridge: ICON's cross-chain tools
Education
The complete recorded explanations are available here with their sources and individual review evidence.
What ICON is, and where it stands in its 2026 wind-down
Record review:
ICON is a delegated proof-of-stake blockchain with ICX as its native coin. One ICX equals 10 to the power 18 loop. Mainnet uses network ID 0x1 and the goloop client. The project moved its DeFi hub to Sonic under the SODAX name, while the ICON chain remains in its announced maintenance period. The Foundation reports ending emissions and staking rewards in March 2026 and plans a permanent halt on 31 December. Older documentation still describes superseded economics.
ICX began as a token on Ethereum; ICON's learning pages say holders swapped it for native ICX in mid-2018 after the mainnet launched.
ICX pays transaction fees and provides delegation weight. Older docs describe new issuance and a monthly reward allocation; the Foundation says emissions and staking rewards ended on 26 March 2026. Their historical amounts are not a current supply reading.
Addresses are 20 bytes written in hexadecimal: user accounts start with hx and smart contracts start with cx.
The Foundation describes SODA on Sonic with a maximum supply of 1.5 billion and an ICX conversion ratio of one for one. Its 24 September notice schedules closure of the reverse direction on 25 September and a final migration deadline of 31 December 2026. Execution of those controls was not independently tested.
The Foundation reports seven core nodes operating during maintenance. Current block production and the block interval were not independently measured.
After the halt the Foundation says a read-only archive will be available for looking up historical transactions; no address for it has been published.
Common misunderstandings
The announced economic shutdown ends emissions and rewards; it is distinct from the permanent chain halt planned for 31 December 2026.
SODA is not ICX renamed on the same chain; it is a separate token on Sonic, and ICX left unmigrated after the deadline can no longer be converted.
SODAX is not a new layer of ICON; the Foundation describes it as a cross-network execution and liquidity system whose hub is Sonic.
Limits
The learning pages describe issuance and staking as they were in 2022; the current ICX supply and how much ICX has been migrated were not verified.
Correction history was not recorded for this historical item.
Delegated proof of stake: main P-Reps, and the seven core nodes of 2026
Record review:
ICX holders stake and delegate to registered P-Reps, whose ranks determine participation in consensus. Validators propose blocks and vote on them. The Foundation reports moving its delegations onto seven core nodes during the 2026 wind-down, removing the bond requirement and ending rewards. It describes all seven as Foundation-controlled. Current operator identities and vote weights were not independently read.
Registering as a validator cost 2,000 ICX, per ICON's validator guide; holders then delegated staked ICX to the candidates they chose.
Validators take turns proposing. A proposer processes transactions, builds the block and sends it to the other validators, who vote on whether it is valid; if it fails, another validator is chosen.
In 2022 ICON's learning pages described main validators (ranks 1 to 25), who produced blocks and voted on network proposals with a 67% threshold, and sub validators (ranks 26 to 100).
Older documentation describes issuance distributed to validators, voters and the Contribution Proposal System. Those historical allocations do not describe rewards during maintenance, when the Foundation says emissions have ended.
The wind-down removed the validator bond requirement, added four Foundation nodes, moved Foundation delegations so the core seven held ranks 1 to 7, and excluded nodes ranked eighth and below from consensus.
Protocol staking locks ICX in the holder's account; delegation assigns P-Rep voting weight without transferring spending control to that P-Rep. The Foundation's maintenance plan still uses delegated ranks. Ending rewards therefore does not by itself remove the delegation mechanism.
The built-in Governance SCORE lets P-Reps vote on revision changes and network contract-code updates, then apply approved proposals. Text proposals are advisory; the planned shutdown vote's result was not established.
Common misunderstandings
Staking ICX no longer earns rewards on ICON: all staking rewards and emissions ended on 26 March 2026.
The Foundation's concentrated delegations constrain who reaches the seven consensus ranks; the sources do not establish a separate named-body approval requirement or that every possible delegation change is ineffective.
A documented delegation ranking does not prove today's operator identities or stake distribution.
Limits
Current operator identities, delegated weights and the active lock settings were not read from chain state.
The reward guide says penalties are disabled and the 2026 notice removes bonds; a historical penalty description does not prove automatic conflicting-signature slashing today.
Correction history was not recorded for this historical item.
ICON uses accounts: hx addresses identify user accounts controlled by keys, and cx addresses identify contracts. Contracts respond to calls and can make calls during execution, but do not originate signed transactions independently. State includes a Merkle Patricia tree and Java object graph. The Java execution layer meters instructions and restricts non-deterministic features; the earlier Python environment is deprecated. The announced halt limits future state changes, while SODAX documents migration for selected assets.
User account addresses are 20 bytes with the prefix hx; contract addresses are 20 bytes with the prefix cx and cannot start a transaction.
The docs describe predefined governance and treasury accounts. The built-in Governance SCORE manages network settings and code/revision proposals; current validator information was not independently queried.
Java contracts store data either as key-value entries in the Merkle tree (VarDB, ArrayDB and DictDB) or in the object graph, which the docs call expensive because the whole object is copied each time it changes.
The Java layer blocks random numbers, floating point, network and system calls and long-running operations, so that every node computes the same result.
IRC-2 is ICON's fungible token standard and IRC-3 its non-fungible token standard, both marked final in ICON's improvement proposals list.
The Java page says multi-threaded support lets a node execute multiple transactions in parallel. It does not document shared-state conflict handling or identify the scheduler running on mainnet; the claim alone does not establish that complete execution path.
Common misunderstandings
Being written in Java does not mean a contract can use any Java feature; the execution layer rejects non-deterministic ones.
A cx address has no private key, so funds held there move only as the contract's code allows.
Limits
Asset value after the planned halt is not established by a migration description. SODAX's listed conversions do not cover every ICON token or application.
The reviewed multisig proposal and zero-knowledge tutorial do not establish current programmable account control or shielded value transfers.
Correction history was not recorded for this historical item.
ICON charges fees in steps, its unit of computational effort, paid in ICX. A transaction sets a step limit, the most steps it may use, and the node's debug interface can estimate the steps a transaction needs. ICON's docs give the initial step price as about 10 to the power -8 ICX and say validators can vote to change it; the price in force today was not read. The smallest ICX unit is the loop, 10 to the power -18 ICX. The main caveat is that the docs' figures are old and illustrative; SODAX's migration page estimated the ICON network fee for an ICX-to-SODA migration at about 0.02 ICX on 11 October 2026.
Fees cover three things, per the docs: running contract functions, using the chain's database, and the size of the transaction data.
A step estimate request is the transaction without its step limit and signature, sent to a node's debug endpoint with the method debug_estimateStep.
1 ICX = 1,000,000,000,000,000,000 loop (10 to the power 18), according to ICON's ICX documentation.
SODAX's migration page, read on 11 October 2026, estimated about one minute and about 0.02 ICX in network fees for a migration, and said users need Sonic's S token only for later transactions on Sonic, not to receive SODA. These are displayed estimates, not measured transaction outcomes.
Common misunderstandings
Steps are not a separate token; they measure work, and the fee is paid in ICX.
The step price is not fixed forever: the docs say validators can vote to change it as demand changes.
Limits
The current step price, ordinary-transfer step use and fee allocation after emissions ended were not read from chain state.
The migration page's time and fee estimates are not guarantees.
Correction history was not recorded for this historical item.
Validator-confirmed blocks and the August 2026 halt
Record review:
ICON documents confirmation after validators agree on a block and calls its recorded transactions permanent. Inclusion and execution success remain separate: a confirmed transaction can fail. The current consensus fault threshold and fork-handling code were not verified, so the description is not an unconditional safety guarantee. The Foundation reports a roughly 25-hour network halt during the August 2026 migration incident.
A new transaction passes syntax and signature checks and waits in the pool; a node returns a transaction hash only for valid transactions.
icx_getTransactionResult shows whether a transaction is pending or confirmed. If consensus on a block fails, its transactions are removed after a time and must be sent again.
The developer overview describes a two-second block interval. Current block timing was not measured in this check.
At 06:18:54 UTC on 27 August 2026, at block 117,479,936, the Foundation halted the network to freeze balances after an exploit of its migration contract; blocks resumed at about 07:51 UTC on 28 August, and the Foundation says balances resumed unaffected.
The Foundation plans to stop block production permanently on 31 December 2026 and provide an archive; implementation of the future halt and archive availability are not yet verified.
Common misunderstandings
A documented confirmation rule does not remove assumptions about validator behaviour or guarantee that the network will keep producing blocks.
The August 2026 halt was a pause, not a reversal of the exploit: the post-mortem says balances were frozen in place and resumed unaffected, and the Foundation is pursuing the released ICX at exchanges instead of undoing the transactions.
Limits
The current vote threshold and fork handling were not verified from the node implementation.
Neither current block timing nor the recovery status of exchange-held ICX was independently measured.
Correction history was not recorded for this historical item.
Running an ICON node: goloop, hardware and snapshots
Record review:
ICON's supported client is goloop, written in Go, and ICON's guides run it as the Docker image iconloop/icon2-node in one of two roles: a validator (role 3) or an API endpoint (role 0) that serves reads and forwards transactions. Both need at least 4 CPU cores, 16 GB of RAM, a 2.5 TB SSD and a 1 Gbps connection. The main caveat is that a new node can restore a snapshot database instead of replaying history, and the Foundation plans a halt on 31 December 2026. The published 1 Gbps minimum places this in the datacenter category under the comparison rule.
ICON's docs describe API endpoints as the public way in: they read the chain and forward any transaction that writes data to a validator.
The guides recommend 8 or more cores, 32 GB of RAM, a 3 TB SSD and 2 Gbps, and ask operators to open port 7100 for peers and port 9000 for JSON-RPC.
Setting FASTEST_START restores the node from the latest snapshot database; that trusts the snapshot's publisher instead of checking every block since launch.
The docs-linked goloop repository could not be read. The public Go package index lists v1.4.4 dated 2 October 2024 and a v1.4.5-rc.0 release candidate dated 22 July 2026; neither identifies the build running on maintenance nodes.
ICON's network guide lists public mainnet API endpoints at ctz.solidwallet.io and api.icon.community. Their current block data were not independently read in this check.
The icon2-docker repository's README lists a lower storage minimum (1.5 TB) than the docs; the docs' figures are used here.
Common misunderstandings
Running an API endpoint does not make you a validator, and since March 2026 only the seven core nodes take part in consensus.
A snapshot start is not an independent check of the chain's full history.
Limits
Which goloop version mainnet validators run, and whether its source will be published again, were not verified.
Correction history was not recorded for this historical item.
Wallets, hardware custody and migrating ICX to SODA
Record review:
Hana is a browser wallet whose current site lists ICON; Ledger documents a device connection through Hana for ICX. The Foundation's 2024 Ledger Live announcement is historical, and current Ledger Wallet feature parity was not verified. Trezor's ICON page says Trezor does not currently support ICON. The Foundation schedules one-way ICX-to-SODA migration from 25 September and a final deadline of 31 December 2026; wallet use does not change that announced deadline.
Ledger's ICON page documents the device-to-Hana route for ICX management. The device's handling of each contract or migration transaction was not tested.
The Foundation announced ICX send/receive support in Ledger Live in September 2024 and recommended Hana for staking then. Current vendor documentation supports the Hana route; direct Ledger Wallet availability remains unverified.
Trezor's ICON page says Trezor does not currently support ICON and asks earlier users to contact its support team.
SODAX's migration tool converts ICX on ICON to SODA on Sonic one for one; users need S, Sonic's gas token, only for later transactions on Sonic.
Centralised exchanges were expected to convert customer balances automatically, but the Foundation's 24 September 2026 update told holders to migrate in self-custody now and not wait on an exchange.
The SODAX SDK lists conversions for legacy bnUSD and BALN as well as a reverse SODA-to-ICX function. Function documentation is not proof that the reverse route remains available after the Foundation's September closure notice.
Common misunderstandings
Keeping ICX on a hardware wallet does not protect it from the deadline: ICX not migrated by 31 December 2026 can no longer be converted.
Ledger being able to sign for ICX does not mean every Ledger Wallet user sees ICX; the route Ledger documents is Hana Wallet.
Limits
The wallet and migration were not tested, and complete hardware feature parity was not established.
The migration incident report describes owner and relayer controls; its pause/restart wording does not independently establish today's withdrawal availability.
Correction history was not recorded for this historical item.
BTP, xCall and ICON Bridge: ICON's cross-chain tools
Record review:
BTP is designed to verify remote-chain messages with receiving-side contracts; xCall provides an interface over several transports. ICON Bridge delegates verification to Parameta's trusted relay. Documentation differs on deployment: the BTP page lists testnets, while the current route table and xCall deployment wiki list mainnet connections. Current on-ICON consensus verification and route traffic were not established, so a generic cross-chain label does not establish a trust model.
In BTP's stated design, receiving contracts validate relayed evidence. Whether a particular route enforces remote consensus depends on its deployed verifier and controls; the design alone does not establish current route security.
ICON's docs list BTP deployments on the Berlin test network, linked to test networks of BNB Smart Chain, Ethereum and Havah.
The xCall deployment wiki, last edited on 12 March 2025, lists mainnet ICON connections to Archway, Neutron and Injective through IBC, and BSC, Ethereum and Havah through BTP. These are dated deployment claims, not observed traffic or a completed check of receiving-side verifier code.
ICON Bridge moved tokens between ICON and BNB Smart Chain; its docs say the relay checks messages off chain and is operated centrally.
The Foundation's August 2026 incident report describes replayed migration withdrawals, a serial-number fix and an allowlisted protocol relayer. The route therefore relies on the documented operator controls; this check did not verify the repaired contract or current withdrawals independently.
Common misunderstandings
A design that verifies on chain does not make every ICON route trustless: ICON Bridge and today's migration withdrawals depend on relayers their operators choose.
ICON is no longer SODAX's hub; the project announced in May 2025 that it was moving its hub chain infrastructure to Sonic.
Limits
Current on-ICON verification code, relayer operation and mainnet traffic were not established for the listed BTP, IBC and ICON Bridge routes.
A remote-chain verifier and a node snapshot do not establish an independent compact verifier of ICON itself.
Correction history was not recorded for this historical item.
Non-custodial multi-chain browser-extension wallet that lists ICON among its supported chains; ICON's docs call it the officially supported wallet, and Ledger names it as the route for signing ICX with a Ledger device.
Categories
wallet
Recorded historical status
active site observed; ICON community page carries the shutdown notice
Inclusion reason
The wallet ICON's own documentation uses for accounts, transactions and staking.
Limits
The wallet was not tested; device feature parity and current signing behaviour remain unverified.
Hana's current site lists ICON in its Chrome extension, and Ledger's ICON page documents the device connection through Hana.
Correction history was not recorded for this historical item.
SODAX's tool for converting ICX on ICON to SODA on Sonic one for one; it estimates about one minute and about 0.02 ICX in ICON network fees per migration.
Categories
migration, bridge
Recorded historical status
migration page displays ICX to SODA; final deadline announced for 31 December 2026
Inclusion reason
The migration route linked by the Foundation for ICX holders.
Limits
The displayed time and fee are estimates; no transaction was submitted.
The Foundation reports an August exploit, repair and relayer restriction; current owner controls, withdrawal availability and recovery completion were not independently verified.
The current page displays the ICON-to-Sonic flow and its approximate time/fee. Foundation notices supply the migration schedule; the July 2025 forum item is a governance proposal, not an execution receipt.
Correction history was not recorded for this historical item.
DeFi project that began on ICON with an exchange, sICX liquid staking and bnUSD, a collateral-backed dollar stablecoin; its site now describes cross-network swaps that use SODAX intents.
Categories
dex, stablecoin, lending
Recorded historical status
site active; Foundation announced the end of ICON incentives in March 2026
Inclusion reason
The main exchange and stablecoin project in ICON's history.
Limits
The shared 30 September snapshot records ICON exchange deposits and legacy bnUSD, but current pool depth and redemption were not tested.
The snapshot lists only crypto-backed bnUSD on ICON. Circle and Tether lists alone do not prove absence of every issuer-backed stablecoin.
Balanced's own site describes bnUSD and its swaps; the Foundation announced that Balanced savings-rate rewards would end on 2 March 2026 and ICX/sICX liquidity rewards on 13 March 2026.
Correction history was not recorded for this historical item.
Docker packaging (image iconloop/icon2-node) for running goloop as an ICON validator or API endpoint, with an option to start from a snapshot database.
Categories
node, protocol-infrastructure
Recorded historical status
node packaging repository reachable; current running build not verified
Inclusion reason
The documented way to run an ICON node.
Limits
Which goloop version mainnet runs was not verified, and running a node has a short horizon before the planned halt.
ICON's guides and icon2-docker document this image and snapshot startup. The repository lists a 1.5 TB minimum disk while the guides list 2.5 TB; both publish a 1 Gbps link minimum.
Correction history was not recorded for this historical item.
Centralised token bridge between ICON and BNB Smart Chain built on BTP message formats, with off-chain verification by a relay that Parameta operates privately.
Categories
bridge
Recorded historical status
repository reachable; current mainnet use not verified
Inclusion reason
One of ICON's own cross chain routes, included so its trust model is visible.
Limits
The docs identify Parameta's trusted relay; current mainnet relay operation, upgrade authority and route traffic were not verified.
ICON's docs describe the design and the Parameta relay; the repository describes itself as the centralized bridge of ICON.
Correction history was not recorded for this historical item.
ICON's cross-chain message interface and its contracts for several chain types, carrying messages over BTP or IBC.
Categories
interoperability, developer-tooling
Recorded historical status
public repository and deployment list reachable; current route operation unverified
Inclusion reason
The messaging standard at the centre of ICON's cross chain focus.
Limits
Which xCall routes still carry traffic on ICON mainnet was not verified.
The repository documents several connection implementations and links a wiki listing mainnet ICON connections. The wiki was last edited on 12 March 2025; this does not establish operation within the last twelve months. The commit feed could not be retrieved, so no latest-commit date is asserted.
Correction history was not recorded for this historical item.
Current mainnet block production, validator identities, vote weights, node versions and staking lock settings were not independently read.
The May shutdown governance vote and the actual September one-way migration switch were not verified from receipts.
The docs-linked goloop repository was unavailable; current consensus fault bounds and conflicting-signature handling were not verified.
No current compact ICON verifier was established; snapshots do not independently authenticate chain history.
BTP's testnet table conflicts with the mainnet route list; destination-side verifier code and current BTP/IBC traffic were not established.
Account-control multisig deployments, shared-state parallel execution, shielded transfers, authenticated data updates, open offers, swaps, recovery, channels and rollups remain unverified beyond the candidates named in the cells.
Current step price, ordinary-transfer step consumption and fee allocation after emissions ended were not read.
The 2026 migration incident report contains pause/restart wording that does not independently establish current withdrawal availability; owner signing threshold and remaining ICX recovery are unverified.
Explorer current records could not be read; neither the promised archive address nor a second serving operator was established.
Ledger Wallet availability and feature parity were not verified.
The published 1 Gbps minimum drives the node category; actual disk use and bandwidth were not measured.
Current legacy Balanced pool depth and bnUSD issuance/redemption were not tested; the ecosystem measurements are the mandated frozen dataset.
Live DeFiLlama volume retrieval was unavailable and the protocols response exceeded the reader limit; the adopted frozen dataset supplies the required figures.
Sources
Oldest dated source check:Source check overdueSource checked Sep 30, 2026; next check was due Oct 30, 2026.
0 of 45 sources checked in the last 30 days; 45 are past the 30 days recheck.
Found something wrong or out of date? Reporting is free, and every chain goes through the same process. Published corrections appear in the public log.